Skip to main content

Build Matt Ltd.

Cable Trays

Wire Mesh Cable Tray Route Changes: Planning Bends, Branches and Equipment Connections

AI Summary

A wire mesh cable tray route change needs more than a line on a drawing. Each bend geometry, branch location, cable exit and equipment connection should be defined against the cables' required bending path.

Compatible fittings, edge protection and the receiving cabinet or containment interface also need agreement. Project teams should settle these details with the selected supplier and responsible designers before procurement, rather than assuming the tray can be freely altered on site.

Planning Wire Mesh Cable Tray Transitions Beyond Straight Runs

A straight wire mesh cable tray run is relatively simple to describe. Bends, branches and cabinet approaches are different, because each one changes how cables travel, how loads reach supports and who owns the connection.

Build Matt fabricates steel cable trays and accessories such as elbows, tees and supports. This guide sets out what to define at each transition before ordering a mesh wire cable tray or cable basket system.

Wire Mesh Cable Tray Route Changes to Identify on Drawings

A route drawing shows where the tray goes, but not every point where the cable path is disturbed. Each transition on a mesh wire tray route should be marked so it can be detailed and checked separately.

  1. Horizontal changes in direction around columns or walls.
  2. Changes in elevation, including vertical offsets to pass beams or ducts.
  3. Branches serving separate equipment rooms, panels or work areas.
  4. Points where individual cables leave the tray before its endpoint.
  5. Crossings with other services where clearance is limited.
  6. Approaches to cabinets, racks and equipment.

Give each transition a location reference, elevations and the direction of cable travel, so every party discusses the same point.

The route centre line is not the full space requirement. Cables need room to turn, supports need fixing positions and installers need access, so these zones should be shown alongside the line.

Wire Cable Tray Bends and Exits: Cable Information Needed

Cable tray bends must accommodate the cable manufacturer's bending limits and the selected tray system's geometry, fittings and installation requirements. Collect the following before any transition geometry is fixed.

  1. Cable types, quantities and outside diameters.
  2. Minimum bend radius stated by each cable manufacturer.
  3. Separate bending limits during pulling and in the final position, where the manufacturer specifies both.
  4. Bundle arrangements and the weight carried through the transition.
  5. Direction of entry and exit at each bend or exit point.
  6. Separation requirements set by the responsible designer.
  7. Spare capacity for planned additions, where the brief includes it.

Tray width alone does not establish a suitable bend radius. A wide tray with a tight inner corner can still force large power cables or fibre optic cables beyond their limits.

Power, copper data and fibre optic cables have different bending, separation and handling requirements. Check each group against its own specification rather than an assumed common figure.

Cable Basket Branches and Local Support Arrangements

A branch splits both the cables and the load path, so the drawing should state which cables continue and which leave.

  1. Space for cables to separate without forced or crossed bends.
  2. Support positions close to junctions and elevation changes.
  3. Concentrated cable loading where bundles divide or turn.
  4. Access for pulling, placing and later maintenance.
  5. Clearance from adjacent containment and building services.

Cutting or altering a cable basket section to form a junction can change how it carries load. A rating published for a straight length should not be assumed to apply unchanged at a branch.

Support spans and loading limits should come from the selected system's documentation and the responsible design review. Once positions are agreed, Build Matt can be consulted on fabricated steel supports and brackets.

Mesh Wire Cable Tray Fittings and Edge Treatments to Agree

Wire mesh cable tray systems differ in what their manufacturers permit. Confirm the following with the selected supplier before approving orders or site work.

  1. Compatible connectors, junction components and fixing accessories.
  2. Whether a transition uses a factory fitting or a permitted site formed arrangement.
  3. Manufacturer instructions covering any allowed modification.
  4. Treatment of exposed ends and points where cables bear on wire.
  5. Finish repair requirements for the specified material, where applicable.
  6. Material and environmental compatibility of every accessory.
  7. Any effect of alterations on declared loading or electrical continuity.

Edge protection must suit the actual cable path, sheath and operating environment. A generic cap or sleeve should not be accepted without checking it against these conditions.

Cable tray fittings and accessories from another manufacturer, or those made for ladder or perforated trays, should not be assumed compatible with a steel wire cable tray. Build Matt supplies elbows, tees and vertical bends for its own steel tray range, so any mixed interface needs confirmation first.

Wire Mesh Cable Tray Connections to Cabinets and Other Containment

Tray, cable and enclosure responsibilities meet in the final metres before a cabinet, so define each handover point clearly.

  1. Cabinet or rack entry position and the space available at the entry.
  2. Room for cables to bend before termination.
  3. Cable support and strain relief close to the entry.
  4. Glands, bushes, entry plates or other specified protection.
  5. Transitions to conduit, trunking, ladder tray or another containment system.
  6. Which contractor supplies each interface fitting.
  7. Enclosure protection and penetration requirements.

Attaching the tray to a cabinet is a mechanical connection, not a cable termination. It does not by itself restrain cables or preserve the enclosure's protection rating.

Where bonding is required, follow the selected system, the electrical design and applicable requirements. No connector should be assumed to provide continuity, and the tray is not a protective conductor unless the design confirms it.

Where a mesh route meets ladder or perforated tray, Build Matt can review the steel interface components needed on its side of the handover.

Wire Mesh Cable Tray Design Records for Route Transitions

Each agreed transition should carry an identifier linked to the coordinated drawing set.

Records should also hold support and loading information, supplier references and interface responsibilities.

Transition Detail to record
Direction change Reference, angle, elevations, fitting reference and critical cable bend requirement
Branch Continuing and departing cables, junction component and adjacent support positions
Cable exit Exit location, cables leaving and the approved edge treatment
Cabinet connection Entry position, interface fittings, supplying contractor and enclosure requirements

Later changes to cable quantities, route geometry or equipment entry points can invalidate an agreed detail. Review the affected transitions and update records, including approved deviations and the installed arrangement.

About Build Matt Steel Cable Trays and Accessories

Build Matt is a Kampala based steel fabrication company established in 2001, serving projects across Uganda and East Africa. Its range includes ladder, perforated and solid bottom steel cable trays, with supports, brackets, elbows, tees, vertical bends and splice plates.

Sharing route drawings, cable requirements and the intended scope of supply helps the Build Matt team confirm which components it can fabricate and which remain with the wire mesh system supplier.

Confirming Wire Mesh Cable Tray Transition Details

Every bend, branch and cabinet approach on a wire mesh cable tray route should be settled before ordering, covering the cable path, compatible components and who supplies each interface.

Resolving these points before procurement helps reduce the need for improvised alterations during installation. For related steel trays, supports or fittings, project teams can discuss their drawings and fabrication requirements with Build Matt.

Wire Mesh Cable Tray Route Change FAQs

What information is needed before planning a wire mesh cable tray bend?

You need the bend location and elevations, cable types and diameters, each cable manufacturer's minimum bend radius, bundle weight and direction of cable travel. Sharing these with the tray supplier, or with Build Matt for steel components, allows the geometry to be checked before ordering.

Can a cable basket be modified on site to create a branch?

Only where the manufacturer's instructions permit it and the method has been agreed. Cutting a section can change its load performance and leave exposed ends, so confirm the approach, edge treatment and supports with the system supplier first.

Which drawings should be updated after a route change?

Update the coordinated route drawing, affected transition details, support layouts and any cabinet interface drawings. Record approved deviations and the installed arrangement, and send revised drawings to Build Matt where its fabricated components are affected.

Can ladder tray fittings be used with a wire mesh cable tray?

Not without confirmation. Fittings designed for ladder or perforated trays use different joining and support arrangements. Build Matt fabricates elbows and tees for its own steel tray range, so any connection to a mesh system should be checked with both suppliers.

What should happen if cable quantities change after fittings are ordered?

Recheck the affected bends, branches and supports against the revised cable diameters, bending limits and loading before installation. If ordered fittings no longer suit, raise the change with the supplier, including Build Matt where its steel components are involved, and update the transition records.

How should abandoned branches be recorded after a route alteration?

Mark the abandoned branch on the coordinated drawings, note whether its tray section and supports were removed or left in place, and record any changes to adjacent supports or edge treatment. This stops later teams treating unused containment as available capacity.

Who should approve a transition detail involving more than one supplier?

The responsible designer should approve it after each supplier confirms compatibility for its own components. Where Build Matt supplies steel supports or interface items, its confirmation should cover only that scope, with the wire mesh supplier confirming its own fittings and modifications.

Get a quote

Planning a steel or prefab project in Uganda?

Tell us what you need and our engineers will come back with advice, a layout and a price. No obligation.

  • Design, fabrication and installation by one team
  • Container offices, warehouses, mezzanines, staircases and more
  • Site visits across Uganda and East Africa

We reply within one working day. No spam.